icon Add as a preferred source Download PDF version

Adcock has secured a maintenance contract for the Cambridge American Cemetery located in Coton, just outside of Cambridge. The Cambridge American Cemetery site is 30.5 acres in total with over 3500 burial plots.

Heating & Air Conditioning Equipment

Adcock is looking after the heating and air conditioning equipment installed throughout the 4000 square foot visitors center which opened in May 2014.

 This includes a highly energy-efficient air source heat pump to water for underfloor heating.

Maintenance Visits

The cemetery and visitors center is open to the public daily and on the majority of public holidays between the hours of 9-5.

Adcock has been able to offer flexible, reliable, and organized maintenance visits to work around the public visiting hours.

In case you missed it

Mitsubishi Electric's Call For Energy Reform In UK
Mitsubishi Electric's Call For Energy Reform In UK

Despite 80% of UK homeowners saying they care about climate change, heat pump adoption in UK homes remains critically low, with only 6% making the switch. According to Mitsubishi...

Midea Equipping Contractors To Seize On The Transition To Heat Pumps
Midea Equipping Contractors To Seize On The Transition To Heat Pumps

The HVAC market is in transition. Heat pumps are no longer niche, but are becoming the default replacement for both furnaces and central AC. Midea is responding to the new normal a...

Carrier Corporation Unveils New Coolant Distribution Unit (CDU) For Data Centers
Carrier Corporation Unveils New Coolant Distribution Unit (CDU) For Data Centers

The new Carrier Coolant Distribution Unit, part of the growing QuantumLeap portfolio of purpose-built data center solutions that extends from chip to chiller, is now available. Car...

vfd