icon Add as a preferred source Download PDF version

AB Produce comprises two divisions, Prepared Vegetables and Potato Washing, grading and packing circa 1000 tons of produce weekly. A relocation took place, moving to a 70,000 sq. ft purpose-built factory on a 14 acre site. AB’s equipment had been poorly maintained and repaired for some years. When Adcock Refrigeration and Air Conditioning first received the invitation to come on site, they highlighted several existing faults that required attention.

Once they were given the opportunity to work on their equipment, AB quickly saw the improvement in their chilled area temperatures. Adcock has received positive feedback from the client for the improvement in the performance of their equipment.

In case you missed it

Mitsubishi Electric's Call For Energy Reform In UK
Mitsubishi Electric's Call For Energy Reform In UK

Despite 80% of UK homeowners saying they care about climate change, heat pump adoption in UK homes remains critically low, with only 6% making the switch. According to Mitsubishi...

Midea Equipping Contractors To Seize On The Transition To Heat Pumps
Midea Equipping Contractors To Seize On The Transition To Heat Pumps

The HVAC market is in transition. Heat pumps are no longer niche, but are becoming the default replacement for both furnaces and central AC. Midea is responding to the new normal a...

Carrier Corporation Unveils New Coolant Distribution Unit (CDU) For Data Centers
Carrier Corporation Unveils New Coolant Distribution Unit (CDU) For Data Centers

The new Carrier Coolant Distribution Unit, part of the growing QuantumLeap portfolio of purpose-built data center solutions that extends from chip to chiller, is now available. Car...

vfd