Safety standards - Case Studies

Adcock Moves Four Existing Coldstores From CEFAS In Lowestoft To Allow Smooth Demolition Works To Take Place

CEFAS is the Centre for Environment, Fisheries and Aquaculture Science and a pioneer in marine science and technology. Adcock has moved four existing coldstores from CEFAS, located in Lowestoft, for facilities management company Interserve FM Ltd who are assisting with site preparation for major demolition, change and refurbishment works to one of the buildings onsite. Adcock was asked by Interserve FM to move the coldstores. Temperature alarm system Cefas have relocated these coldrooms to al...

Adcock Refrigeration And Air Conditioning Completes Replacement Installations At The University Of East Anglia

Adcock Refrigeration and Air Conditioning were asked to carry out replacement works for the University of East Anglia (UEA), working with CBRE. The project was to replace the condensing units and evaporators for the campus supermarket coldrooms. The existing units were originally designed to operate on R22 and were sited in a poorly ventilated plant room which caused issues in the summer heatwave. The new units were sited externally above a loading bay area. Purpose built scaffolding was built...

Schneider Electric’s Provides Cleaner Power To A Paper And Pulp Producer Oji Fibre Solutions

Among the more confounding issues facing industrial-plant operators is the challenge of power factor correction. Though power factor can be explained simply as the ratio of useful power to the total power drawn from the grid, it can remain a puzzle to both understand and to address. Industrial operations are especially susceptible to power factor problems because of the dynamic loads they can incorporate. Cranes, welders, saws and other such equipment can create electrical conditions requiring...

Trane Provides Four Series E CenTraVac Chillers To Enhance HVAC Solutions In The Landmark Channel Tunnel

Eurotunnel releases official data demonstrating energy savings of 33 percent after the first season of operating a new cooling system for maintaining requisite temperatures in the landmark Channel Tunnel. The operator saved 4.8 GWh and approximately € 500,000 in 2017 courtesy of the new cooling system – equivalent to saving enough electricity to run 1,000 households. The newly released data from the operation of the new cooling system will dramatically boost Eurotunnel’s sustai...

vfd