In July 2007, National Steel Car Ltd. of Hamilton, Ontario Canada announced its plans to construct a 2.1 million square feet railcar manufacturing facility that spans nearly a mile. The $350 million facility, run by the company’s newly formed subsidiary, National Alabama Corporation, will have a production rate of 8,000-10,000 rail cars per year and employ 1,400-1,600 workers. The LEED-registered facility will not only improve the railcar manufacturing process, but also minimize impact on the surrounding landscape, reduce water and energy consumption and provide a healthy work environment for employees.

“From the pre-construction process to helping mitigate unforeseen field conditions, Ruskin has provided timely, professional service every step of the way. The size, schedule demands and inherent difficulties of the project were daunting, and Ruskin has proved to be a valuable addition to the team.”, says David Beard, Yates/Walbridge.

Ruskin’s Challenge

  • Help in the design of a natural ventilation solution while not compromising the outside aesthetics of the building.
  • Louver finish must match existing siding in color and design.
  • Develop a fully integrated louver and damper assembly to fit around existing building structures and large openings.

reinforce in a systematic way

Building Team’s goal was to create the most optimal layout for the manufacturing of railcars

The Albert Kahn Family of Companies in collaboration with process engineering partner CKGP/PW and Associates, designed the architecture of the plant. The Building Team’s goal was to create the most optimal layout and operational flow for the manufacturing of railcars.

"We’d gone through a number of iterations, but ultimately we came back to what we already knew but wanted to reinforce in a systematic way. The most efficient way to manufacture a rail car is in a long linear process, because rail cars do not turn that easily. It’s that simple,” says Peter Lynde, PE, LEED AP, Kahn’s Director of Research and Technology and principal on the project. The resulting configuration is a long, narrow facility that spans about 4,200 feet on a 668-acre site.

Ruskin’s Solution

  • Louvers sold by Hoffman & Hoffman, Inc., Raleigh, NC.
  • Dampers sold by Tom Barrow Company, Memphis, TN.
  • Custom designed louver/damper assemblies to match the aesthetics in existing siding and function mechanically around existing structure on the inside.
  • 1047 sleeved ELF6375DX high performance louvers with Low Leak CD36 Control Dampers including Factory Mounted and Commissioned Actuators.
  • 10,000 total linear feet of 3’ and 4’ tall louver/damper assemblies.

natural ventilation system

The design team took advantage of this slender configuration to engineer a natural ventilation system that relies on 100% outside air. The amount of time from groundbreaking to start up the entire operation was less than two years. A joint venture team of W.G. Yates, Jackson, MS., and Walbridge, Detroit, MI constructed the project.

Many large industrial facilities today are air conditioned, or at least partially cooled"

“Many large industrial facilities today are air conditioned, or at least partially cooled,” says Lynde. “That’s an enormous capital and operating expense when you’re cooling two million square feet of plant. We’re using techniques that allow for the natural buoyancy of heated air to be displaced by fresh air entering through louvers at a low level on opposite sides of the building and exiting through louvers and roof-mounted exhaust fans at the high point of the building.”

tempered air-conditioning system

Electric 24 volt motorized dampers, controlled by a building management system, will automatically open to increase natural airflow during warm weather and close to prevent air infiltration during cold weather. This natural approach will reduce the ventilation system’s annual operating costs by 70% over a tempered air-conditioning system and save 4.5 million kWh of annual electrical use.

Lynde says the application of natural ventilation to a manufacturing plant of this size would not be possible with a standard box-shape plant, especially in hot and humid Alabama. “This technique is most effective for plants that are long and narrow, where you can have louvers along both sides of the plant and relatively short distances to the high points of relief,” he says.

effectiveness of natural ventilation

The plant’s north-south orientation enhances the effectiveness of natural ventilation by facing the narrow portion of the building toward the hot southern exposure, minimizing solar heat gain, and the wide portion toward the prevailing breeze, optimizing the natural airflow. A 2,000-foot-long daylight monitor runs the length of the roof over the construction area in the central portion of the plant.

The monitor will provide abundant indirect daylight in those places where most of the employees work. Lynde says the team considered skylights but ultimately chose the monitor approach because it could meet both the daylighting and natural ventilation goals (fans and louvers are incorporated into the monitor).

advanced fume-collection technology

Ruskin Vice-President of Engineering Dan Rau visited the jobsite to see what obstacles may exist

With an efficient ventilation system in place, the team implemented advanced fume-collection technology that minimizes noxious fumes in the facility. The approach replaces traditional truss-level, centralized air cleaners with smaller unitary systems. “The railcar fabrication and assembly process is extremely weld-intensive, and can release quite a bit of fumes into the air,” says Lynde.

The unitary approach involves placing welding fume collection at the weld station, where the fumes have a much better chance of being collected. The air is captured, filtered, and returned to the plant clean. Ruskin Vice-President of Engineering Dan Rau visited the jobsite to see what obstacles may exist. What he found was that most of the shell of the building had been erected as well as interior columns and beams.

provide the extra support

There was no way that the specified “off the shelf” standard louvers and dampers were going to work in these existing large openings. Additionally, the louvers on the upper level were going to need extra support for higher windloads. The Ruskin Engineering and Sales teams went to work and came up with the only solution – a fully sleeved ELF6375DX/CD36 assembly.

These assemblies included blankoffs, factory mounted and commissioned actuators, special damper bird screens in lieu of louver bird screens, special sleeve lengths and special flanges. Lastly, the unequal damper sections were required to match up with the louver braces and provide the extra support required. Ruskin Operations in Geneva, Alabama and Parsons, Kansas were up to the challenge for this large project and coordinated the shipments of first the louvers and then the dampers based on the construction schedule.

Share with LinkedIn Share with Twitter Share with Facebook Share with Facebook
Download PDF version Download PDF version

In case you missed it

Pandemic Spotlights Need To Balance Costs While Improving Air Quality In Schools
Pandemic Spotlights Need To Balance Costs While Improving Air Quality In Schools

Attitudes about indoor air quality need to change, especially given the current pandemic that forces people to spend most of their time indoors. But addressing the pandemic through increased ventilation and better indoor air quality can be expensive. For example, the Los Angeles Unified School District, the second-largest in the nation, has spent $6 million on HVAC upgrades and new air filters in response to the pandemic and expects to pay about $1.7 million a month for ongoing inspections and filter replacements. Updating & Improving HVAC Systems Updating HVAC systems to minimize virus spread has been an expensive proposition all around. Some school districts in California report the costs are insurmountable. Sometimes seeking to replace or update an HVAC system opens a can of worms: Electrical systems must be rewired, asbestos must be removed, and/or an expensive roof needs to be replaced. Schools in low-income areas are especially likely to be in poor condition, and unable to afford improvements. Some school districts have used money from the federal CARES Act – a $2 trillion federal economic package passed in March – to make ventilation improvements. Hope remains that additional state and/or federal money will be available, but funding is still likely to be inadequate. Airborne Transmission Study showed that some classrooms had air change rates below 0.5 changes per hour The airborne transmission was initially underplayed as a means of spreading the novel coronavirus. There was more emphasis on the dangers of touch during the early days of the pandemic. However, the airborne (aerosol) spread is now believed to make up about 75% of transmissions. A group of 239 scientists from around the world advocated more action to address aerosol spread in a July 2020 open letter to the World Health Organization (WHO). The concern is a global challenge. For example, a survey of 20 classrooms in the United Kingdom, carried out by National Air Quality Testing Services (NAQTS), revealed very low air change rates that could increase the risk of virus transmission. The study showed that some classrooms had air change rates below 0.5 changes per hour (3 to 5 changes per hour would be desirable). Even small increases in flow rate could reduce the risk of infection significantly. Raising airflows from zero to 100 cu m/hour cuts the risk by up to a third, according to NAQTS. Fresh Air Ventilation & Filtration The Scientific Advisory Group for Emergencies (SAGE) advised the UK Government last fall of a need to ensure undisrupted education for children of all ages. A critical part of keeping children in school is clear guidance and support packages, including better ventilation and air filtration, particularly through winter. The German government advises schools to open their windows for at least five minutes every hour Other countries can learn a lot about the value of opening windows to allow in more fresh air from the Germans. For years, Germans have habitually opened their windows twice a day, even in winter. In fact, “lüften,” or airing a room, is among the cheapest and most effective ways of decreasing the spread of the coronavirus. The German government advises schools to open their windows for at least five minutes every hour; for example, when classes are changing. Improving Indoor Air Quality Airing of rooms is a likely factor in the lower number of coronavirus cases reported in Germany compared to, say, the United Kingdom. In the end, improving indoor air quality involves some combination of letting in more fresh air, upgrading air filtration systems, and installing technologies such as UV light to kill pathogens. However, implementing these measures only mitigates the likelihood of contracting COVID-19. Some risk remains.

What Technologies And Trends Will Define HVAC In 2021?
What Technologies And Trends Will Define HVAC In 2021?

The pandemic of 2020 presented unique challenges to the HVAC market, and in many instances, responding to those challenges relied on technical innovation. It’s safe to say that the pandemic accelerated several technology trends, redirected others, and overall raised the stakes in the industry’s ongoing challenge to meet customer needs across a wide spectrum. But what comes now? We asked our Expert Panel Roundtable to weigh in on this question: What technologies and trends will define the HVAC industry in 2021?

Overcoming Engineering Challenges In Riser Design
Overcoming Engineering Challenges In Riser Design

How grooved solutions have been making contractors and engineers reimagine the way they construct risers in vertical buildings? Enter into the right pub, or head to a city’s museum or town hall, and you can often find a picture of how the surrounding area used to look. An image from twenty years ago and the difference isn’t too vast. Fifty years back and there’s a definite change. A picture from over a hundred years ago and it’s practically unrecognizable. And what’s the common theme running through these images? Cities are getting taller. As more people migrated to urban areas, developers saw the need to go higher. But with this comes its own unique set of challenges. How can the safety of ground floor be transferred to, in the most extreme case, level 163? Grooved mechanical pipe joining solutions When it comes to high-rise buildings, there are a number of potential challenges for a piping engineer To find out how grooved mechanical pipe joining solutions are helping developers & engineers go higher, we spoke to Matthew Strohm, Director of Product Development (Piping System Design) at Victaulic. When it comes to high-rise buildings, there are a number of potential challenges that a piping engineer will need to take into consideration, most of which relate to thermal movement and the resulting forces on the building. Other issues such as seismic activity and building creep (the natural movement of a building due to settlement) also need to be taken into account. Compensating for thermal expansion and contraction Specifically related to piping systems and subsequently, pipe joining solutions, is the unique problem of having to compensate for thermal expansion and contraction, while at the same time, accommodating for higher pressure. Change in pipe diameter is not an uncommon concern for engineers, however, providing a solution which could operate at a pressure gauge of 25 bars, or the fluctuating temperature of water, presents its own challenges. It’s with these issues in mind that engineers choose their joining solutions, which is why these are the very criteria we set our Victaulic pipe joining solutions against. Grooved vs. Traditional Pipe Joining For decades, the traditional solutions for joining pipes have been welding, threading or flanging. These are good solutions to choose from, but there is a distinct lack of flexibility in a solution that fuses or flanges system components together. This is where flexible grooved couplings come in. They are solutions that allow controlled linear and angular movement at each joint to accommodate not only for thermal expansion and contraction, but also building sway and creep. So how do flexible grooved couplings manage this? It’s essentially down to the design of their components. The dimensions of the pipe coupling housing key is narrower than the pipe groove, allowing room for movement. Furthermore, the width of the pipe coupling housing allows for pipe end separation, which in turn allows the grooved pipe joint to accommodate movement. Benefits of Grooved couplings There are many benefits of grooved couplings, with space-saving being a key advantage on projects, both large and small There are many benefits of grooved couplings, with space-saving being a key advantage on projects, both large and small. As many project managers and engineers know, saving on space can be the key to unlocking extra value above initial planning. Additionally, grooved couplings are perfectly placed to accommodate for piping movement, whereas welded joints that in their very nature are designed to be fixed in place, need to have an area of space to allow for a welded expansion loop or alternatively, enough space to allow the star-pattern tightening of a flanged flex connector. Saving time, money and labor Besides the savings on space, grooved connections offer contractors savings in three key areas: time, money and labor. The installation-ready design of Victaulic’s grooved couplings allow for an easier installation, meaning a process which might take 30 minutes through a welded solution for instance, can now take just five minutes. As any contractor will testify to, this is valuable time that can be used for other parts of the project. With a reduction in time comes savings in cost and labor. Naturally, less labor is used for the same job and in the case of grooved couplings, less skilled labor is required (in comparison to the high skill level needed for welded joints). It’s these aspects that will ultimately deliver contractors with valuable project savings. Grooved connections offer savings in three key areas: time, money and labor Mechanical riser solutions There are 3 ways to accommodate for thermal movement within risers using a grooved mechanical system: The first method is called top of riser free-floating method and involves installing rigid couplings on the riser and two flexible couplings on the horizontal adjacent piping at the top of the riser, which can reduce the need for riser clamps or other structural during installation and allows the system to move freely within the design tolerances. The second method involves working with grooved expansion loops that help to save up as much as 2/3rd of the size of welded U-shaped expansion loops and avoids forced welded pipe deflection. While welded expansion loops require eight welded joints to assemble, the forces exerted on the joint are far greater than those applied on a grooved expansion loop, and generate greater stress, which ultimately requires larger anchors and guides in order to direct the movement. The third method is working with grooved expansion joints instead of traditional in-line expansion joints, which typically have wear parts and manufacturer-recommended maintenance cycles of five years, which also poses problems due to riser accessibility once the construction is complete. Grooved expansion joints like the Victaulic Style 155 are maintenance-free for the life of the system. Importance of anchors In a system using only flexible joints, risers are installed with anchors at the top and bottom and the piping guided every other length to prevent angular deflection at the joints within the piping run. Anchors distribute the movement forces across the structure and also provide the important task of directing pipe movement. At the pipe anchor location, there will be no differential movement between the piping and the building structure, which forces the pipe to thermally expand or contract from that location. This allows the design engineer to control how and where the movement in a system occurs and to provide the best solution to accommodate that movement. A10 Grooved Riser Anchors upgraded A good manufacturer will always listen to customer demand, especially in an evolving market A good manufacturer will always listen to customer demand, especially in an evolving market. Off the back of strong feedback from contractors, Victaulic recently upgraded its A10 Grooved Riser Anchors to a standard product. With the primary functions of carrying the weights and forces that act downward to the base of the riser and connecting the riser to the rest of the structure, the anchor has been providing sturdy support for some of the tallest buildings around the world. Future trends for high-rise buildings One trend already taking place, and I expect to continue, is contractors bringing riser experts into the project at an earlier stage. It just seems to make logistical sense to operate in this fashion. it’s a more efficient use of time to collaborate early in the process. I believe contractors and engineers will seek assistance from companies such as us to help design blueprints together, working in tandem to produce the right solution. Vertical buildings are on the rise. For generations, people have been moving to urban areas, putting greater demand on housing residents and employees. Through the use of grooved coupling solutions as an alternative to traditional methods, contractors can benefit from greater flexibility, reliability, ease of installation and ultimately and most importantly, speed of the installation process.

vfd